top of page

0

0

3D models

Product

1.4K

Views

0

Please login to appreciate

European Central Bank

Sonnemannstraße 22, 60314 Frankfurt am Main, Germany

coop-himmelblau.at

Source:

Published on 

Oct 3, 2023

by:

login.png

Premium Member

Category

Office

Post Type

Building

Project Type

COMMERCIAL

Country

Germany

Year

2015

Area

185,000 m²

Client

European Central Bank

Photographers

Paul Raftery

Facts:

background.png

Austria

Category:

COMMERCIAL

Office

Project Type:

Post Type:

Building

Country:

Germany

Paul Raftery

Photographers:

Architects:

Coop Himmelb(l)au

Area:

185,000 m²

Year:

2015

City:

Frankfurt

Construction:

Client

European Central Bank

Description:

the architects

Text description by

A new typology of a skyscraper: The hyperboloid cut as a distinctive and unique building characteristic can only be achieved with a completely different kind of skyscraper geometry. The design concept of the ECB was to make a vertical hyperboloid cut through a 185-meter-tall monolithic block, wedge it apart, twist it, and fill the newly created intermediary space with a glass atrium. The result is highly complex geometry and a multifaceted building offering a completely different appearance from each angle: massive and powerful from the South-East, slender and dynamic from the West.

The design of the European Central Bank in Frankfurt combines the new iconic double tower with the vast horizontal structure of the Grossmarkthalle, a protected landmark, creating a new urban development focus in Frankfurt’s Ostend district.

United by an entrance building, these two elements form an ensemble of special architectural significance. Featuring bridges, pathways and platforms, the glass atrium between the two high-rises creates a ​“vertical city”. The semi-public and communicative functions are located in the Grossmarkthalle.

The atrium – a ​“vertical city”

The atrium with its visible steel support structure occupies nearly the entire height between the office towers. Connecting and transitioning platforms horizontally divide this interstitial space into three sections with heights from 45 to 60 meters. Just like public squares, they invite visitors to communicate while hanging gardens ensure a pleasant indoor climate. Elevators and stairs connect the levels together and to the public areas located in the Grossmarkthalle.

The Grossmarkthalle – an ​“urban foyer”

The existing Grossmarkthalle, a former wholesale market built in the 1920s, is used as an ​“urban foyer”. The conference and visitor center as well as the library and employee cafeteria are placed diagonally in the spacious interior, as independent building structures (a ​“house within a house” concept). A floating building penetrates the hall from the outside. With its asymmetrical contours, slanted facades and generous windows, it marks the emblematic entrance to the ECB. The so-called ​“loop”, a glass walkway between the high-rise and the market hall, completes the ensemble.

Focus point of a new urban development

The ECB’s architecture was carefully attuned to its location in Frankfurt’s Ostend district. With its clear orientation towards the various urban perspectives, the ensemble enters a dialogue with Frankfurt’s main points of reference: the Alte Oper, the Museum Embankment, and the skyline of the financial district. The distinctive tower, in turn, can be seen from all the important parts of the city center and the Main river, thereby marking the development of a new center in the East of Frankfurt.

Energy efficiency and sustainability are key factors of the project

The sustainable energy concept includes utilization of rainwater, heat recovery, efficient insulation, sun protection, and natural lighting as well as natural ventilation for the offices. The latter takes place via vertical, room-high ventilation elements installed on the triple-layered hybrid façade of the towers, otherwise acting as a shield. Some areas, such as the atrium and open spaces of the Grossmarkthalle, serve as a buffer zone between indoor and outdoor climates.

Architects

Team

In This Project:

Presentation / Gallery:

+11

Plans & 2Ds:

Materials Used:

More Projects by

Coop Himmelb(l)au

3D Design

Suggest Materials

Suggest Product

© ZHIG

Team

Materials Suggested by Manufacturers:

Model

...

© ZHIG
bottom of page